Purchase a Building

Order sequence for a CSC Building System Kit

  1. After determining which building you would like to purchase, call or email us for a free copy of the Construction Plans for that model and a contract.
  2. Is a permit required to build your project?
    • Generally building 200 square feet or less, used for storage are permit exempt.
    • In some areas farm buildings are permit exempt, depending on how the building is used.
    • A printed copy of the Architectural plans should be taken to your local building official for the final determination.
  3. If no permit is required, you may order your building by phone or email. We will need the following information:
    • Sign the contract provided for your building and pay the deposit by credit card, Check, or wire transfer.
  4. If a permit is required for your project:
    1. Sign the contract provided for your building and pay the deposit by credit card, Check, or wire transfer.
    2. Order 3 sets of Plans which will be signed by a licensed Engineer. These will be mailed to you as soon as the engineer completes them. Production will not commence until you have your permit or you authorize CSC to produce your building.
    3. Prepare the rest of the drawings the building official may require.
      • Site plan
      • Other as required
  5. After the permit is obtained or the building is approved for production, the next deposit according to your contract will be due.
  6. Production time is normally 3-4 weeks.
  7. Final payment is due & the building will be shipped to your building site.